ENA G99

Full Name (EN)

ENA G99 – UK Connection Standard for Generation and Storage Plant

Short Definition (EN)

UK Engineering Recommendation for connecting generation and storage plant to the distribution network.

Category (EN)

Grid Connection, Grid Codes and Power Systems

Definition (EN)

ENA G99 is the connection standard issued by the UK's Energy Networks Association for generation and storage plant connecting to the British distribution network, playing a role broadly comparable to VDE-AR-N 4105/4110/4120 in Germany. It superseded the earlier G59 for larger installations and sets out requirements for protection, frequency and voltage behaviour, and the commissioning and testing procedure. For smaller installations up to 16 A per phase, ENA G98 applies instead.

Full Name (DE)

ENA G99 – britische Anschlussregel für Erzeugungs- und Speicheranlagen

Short Definition (DE)

Britische Engineering Recommendation für den Anschluss von Erzeugungs- und Speicheranlagen an das Verteilnetz.

Category (DE)

Netzanschluss, Grid Codes und Leistungssysteme

Definition (DE)

ENA G99 ist die von der britischen Energy Networks Association herausgegebene Anschlussregel für Erzeugungs- und Speicheranlagen am britischen Verteilnetz und nimmt damit eine ähnliche Rolle ein wie VDE-AR-N 4105/4110/4120 in Deutschland. Sie hat die frühere G59 für größere Anlagen abgelöst und legt Anforderungen an Schutztechnik, Frequenz- und Spannungsverhalten sowie das Prüf- und Inbetriebnahmeverfahren fest. Für kleinere Anlagen bis 16 A je Phase ist stattdessen ENA G98 einschlägig.

Applications

Utility-Scale; C&I; Grid Services

Related Terms

VDE-AR-N 4110; Netzverknüpfungspunkt | VDE-AR-N 4110; Point of Connection

Standards

ENA Engineering Recommendation G99 (Großbritannien)